IC-Flow Insights

What Should a Spreadsheet Migration Readiness Assessment Cover Before ERP Migration?

Before an organisation replaces spreadsheet-driven processes with an ERP, CRM or new application, the project team needs more than a list of files and columns.

Important spreadsheets can contain formulas, business rules, dependencies, manual adjustments, status logic and outputs that have become part of the way the business operates.

A migration readiness assessment should help answer:

What does this workbook do, what depends on it, what needs review, and what must be preserved before transformation?

What is a spreadsheet migration readiness assessment?

A spreadsheet migration readiness assessment is a structured review of an operational workbook before it is migrated, rebuilt, automated or replaced.

The aim is not simply to inspect the spreadsheet technically.

The aim is to identify the business logic and evidence that the implementation team may need for:

Spreadsheet Analysis → Business Rules → Migration Readiness → Review → Target-System Planning → UAT → Sign-off

Why a readiness assessment should happen before configuration

Once ERP or CRM configuration begins, assumptions can become expensive.

If a critical spreadsheet rule is discovered late, the project may need to revisit:

The earlier the spreadsheet logic is understood, the easier it is to decide what should be preserved, redesigned, automated or retired.

1. Understand the workbook purpose

The assessment should first establish what business process the workbook supports.

Examples include:

Without that context, technical formula analysis can be difficult to translate into migration requirements.

2. Identify the workbook structure

The project team should understand:

This helps reveal whether the workbook represents one simple task or several connected business processes.

3. Analyse formulas and calculation logic

Formulas can represent business behaviour that may need to exist in the target system.

A useful assessment should identify formula categories such as:

One IC-Flow demonstration workbook contains:

876Total formulas
4Sheets with formulas
276Cross-sheet dependencies
66Aggregation formulas
420Mixed / complex formulas

A workbook at this level can contain far more business logic than is obvious from visual inspection alone.

4. Identify important inputs and outputs

Migration teams should know which fields enter the process and which outputs the business relies on.

Key inputs may include:

Key outputs may include:

These outputs can become important acceptance criteria during UAT.

5. Map spreadsheet dependencies

A workbook can contain relationships between fields, formulas, worksheets and outputs.

Input → Formula → Cross-Sheet Dependency → Business Rule → Output

Dependency analysis helps identify which areas may be affected when a field or calculation changes.

It can also reveal hidden migration scope that may not be visible from a simple list of worksheets.

6. Convert spreadsheet logic into business rules

Technical formulas become more useful when translated into structured business meaning.

Spreadsheet logic:
Total Cost = Fuel Cost + Maintenance Cost + Manual Adjustment

Business rule:
Total vehicle cost must include fuel expenditure, maintenance expenditure and approved manual adjustments.

Migration question:
Should manual adjustments remain possible in the target system, and who should be authorised to make them?

These rules can be placed into a Business Rule Register for review and sign-off.

7. Assess which rules need review

Not every detected rule should automatically be treated as migration-ready.

A readiness assessment should distinguish between logic that appears straightforward and logic that needs:

This is important because automated analysis should support business review, not replace it.

8. Identify business-owner and sign-off requirements

A workbook may contain rules that affect financial, customer or operational decisions.

Those rules should not be migrated simply because they exist.

The project team should ask:

9. Generate migration questions

A strong readiness assessment should create questions that move the project forward.

Examples include:

These questions can support discovery workshops and stakeholder review.

10. Consider the target system

Spreadsheet logic should not always be reproduced in the same form.

A readiness assessment can help the implementation team consider whether a spreadsheet element should become:

Target-system mapping should be treated as planning guidance and reviewed by the implementation consultant and business owner.

11. Turn important rules into validation and UAT evidence

Migration readiness should connect discovery with testing.

Spreadsheet Evidence → Business Rule → Migration Requirement → Target-System Mapping → UAT Test → Business Sign-off

For example:

Business rule:
Maintenance cost must include labour and parts but exclude costs covered by warranty.

Suggested validation:
Test examples with and without warranty coverage and confirm that the target system produces the expected result.

12. Check whether the workbook has changed

Migration discovery can become stale if users continue updating the workbook after the initial assessment.

Version comparison can help identify:

In one IC-Flow comparison example, both workbook versions contained 271 formulas, yet detailed comparison detected 7 formula changes.

Formula count alone would not have revealed the change.

What should a migration readiness assessment deliver?

A useful assessment should produce structured evidence that can be reviewed by consultants, project managers and business owners.

Typical outputs may include:

Example: what IC-Flow can surface from one workbook

In one IC-Flow demonstration assessment, the workbook analysis identified:

5Sheets
876Formulas
276Cross-sheet references
891Detected business-rule records
711Rules requiring sign-off
22Actionable open questions

The purpose of those findings is not to overwhelm business users with raw technical detail.

The purpose is to create structured evidence that can be prioritised, reviewed and used during migration planning.

Who can use a spreadsheet migration readiness assessment?

ERP and CRM implementation consultants

To accelerate discovery and identify spreadsheet-derived requirements before configuration.

Programme and project managers

To identify unresolved migration questions, ownership requirements and sign-off risks.

Business analysts

To convert spreadsheet behaviour into reviewable business rules and requirements.

Business owners

To confirm whether detected rules still reflect the current process.

UAT and test teams

To use important spreadsheet outputs and rules as starting points for validation scenarios.

Transformation teams

To understand which parts of spreadsheet-driven processes should be preserved, redesigned, automated or retired.

When should the assessment be performed?

The most useful time is generally before detailed target-system configuration is finalised.

Useful points in the project lifecycle include:

How IC-Flow supports spreadsheet migration readiness

IC-Flow analyses operational spreadsheets before ERP, CRM or application transformation and turns undocumented logic into structured evidence.

IC-Flow can help with:

Migration readiness is about reducing uncertainty before transformation

The goal is not to migrate every spreadsheet formula exactly as it exists today.

The goal is to understand the existing business behaviour well enough to make informed decisions about what should happen next.

Preserve what matters.
Clarify what is uncertain.
Redesign what should improve.
Retire what is no longer needed.

Before ERP migration, understand the spreadsheet evidence

What does this workbook do?
What depends on it?
What changed?
What must be preserved?
What requires review and sign-off?

IC-Flow helps turn those questions into structured migration evidence for discovery, review, UAT and handover.

See what an IC-Flow assessment produces

Review a sample Migration Readiness Assessment and see how workbook structure, business rules, dependencies, validation questions and migration evidence can be brought together.

View Sample Assessment View the IC-Flow demo

Preparing for ERP, CRM or application transformation?

If important business processes still depend on spreadsheets, assess the workbook before migration and configuration decisions are finalised.

Request a Migration Readiness Assessment